Schedule Updates
March 23, 2016
Update Highlights
- Overall System Update 50% - Time frame hase been extended. Built system to perform wider range of loads to used in demo. Testing new loading of system with
a three-phase motor and dc motor to provide load.
- Student expo and project demostration preperation were removed as not require to the project.
- Other task besides the project functionalities are not clearly stated at this current time and need to verify the tasks remaining for the project.
Detailed Schedule Update