AC System Monitoring Device

Schedule Updates

March 23, 2016

Update Highlights

  • Overall System Update 50% - Time frame hase been extended. Built system to perform wider range of loads to used in demo. Testing new loading of system with a three-phase motor and dc motor to provide load.
  • Student expo and project demostration preperation were removed as not require to the project.
  • Other task besides the project functionalities are not clearly stated at this current time and need to verify the tasks remaining for the project.

Detailed Schedule Update

Detailed Update March 23,2016