Schedule Updates
March 9, 2016
Update Highlights
- Calculate Power Factor Testing 100% - Finished power factor calculation testing to verify operations
- Power factor control testing 100% - Finished testing of power factor control with operations with the SEL-2411 Automation
controller. Power factor control successfully corrects the power factor of the load.
- User interface control build 100% - Finished the logic to control the automation of the power factor correction. Logic
operations are as expected and work with automatically turnning on and off depending on the power factor of the load.
- Design Review 100% - Successful presentation of current design progress for the AC system monitoring device.
- Spring Break is from March 12th to 20th this is bad scheduling as the overall testing is during the springbreak
- Remaining tasks for the projocted are planned on to be finished by project demostration date March 24
Detailed Schedule Update