AC System Monitoring Device

Schedule Updates

December 9, 2015

Update Highlights

  • Calculate Power Factor Build 70% - Continuing on the building of the circuitry to change the power factor to test specified ranges for the AC system monitoring device. Continuing work with the power factor control build.
  • Power Factor Control Build 50% - Progress on the designing automation controls for the power factor control. Capacitor used in the power factor correction are causing nonlinear relationship with current waveform. Looking at different capacitors to be used in the power factor correction that produce more linear response on the output.
  • User Interface Control Build 60% - Continuing the implimentation of push buttons on the device to be used in the controls. The design is concurrent to the progress of the power factor control build.
  • Project is still currently around 2 week ahead of schedule. All work needed to be completed this semester has been finished.
    Note: Work on the user interface control will not be performed over the Winter Break from December 8, 2015 to January 20, 2016

Detailed Schedule Update

December 9, 2015 Detailed Update