AC System Monitoring Device

Schedule Updates

December 2, 2015

Update Highlights

  • Calculate Power Factor Build 50% - Building circuitry to change the power factor to test specified ranges for the AC system monitoring device. Continued work with the power factor control build.
  • Power Factor Control Build 35% - Relay for power factor control was aquired. Designed circuit to switch of the capacitor bank for power factor correction. Will be programming the SEL-2411 to control the relay to be used in the automated power factor correction.
  • User Interface Control Build 40% - Implimented push buttons on the device to be used in the control of the relay in the power factor control build.
  • Project is still currently around 2 week ahead of schedule. All work needed to be completed this semester has been finished.
    Note: Work on the user interface control will not be performed over the Winter Break from December 8, 2015 to January 20, 2016

Detailed Schedule Update

Decemeber 2, 2015 Detailed Update