Schedule Updates
December 2, 2015
Update Highlights
- Calculate Power Factor Build 50% - Building circuitry to change the power factor to
test specified ranges for the AC system monitoring device. Continued work with the power factor control
build.
- Power Factor Control Build 35% - Relay for power factor control was aquired. Designed
circuit to switch of the capacitor bank for power factor correction. Will be programming the SEL-2411
to control the relay to be used in the automated power factor correction.
- User Interface Control Build 40% - Implimented push buttons on the device to be used
in the control of the relay in the power factor control build.
- Project is still currently around 2 week ahead of schedule. All work needed to be completed this semester has been
finished.
Note: Work on the user interface control will not be performed over the Winter Break from December 8, 2015 to
January 20, 2016
Detailed Schedule Update