Schedule Updates
November 25, 2015
Update Highlights
- Progress Presentation 100% - Completed
- Power Factor Control Build 15% - Started the design proccess for the power factor control.
Ordered power relay in order to control the power factor correction control. Currently design the
size of capacitors to be used in correction. Meeting the 0.3 power factor minimum spec will pose some difficulties
as requires currents around 2 amps for the load.
- Project is currently about 2 week ahead of schedule. All work needed to be completed this semester has been
finished.