Schedule for Completion

As of the end of the Fall 2008 semester, the primary research for this project was nearly completed.  Most of the Spring 2009 semester was spent applying what has been learned by designing a controller to control the speed of a DC motor and implementing it using the DS1103 Board.  The proposed schedule for the Spring 2009 semester is shown in the Table below along with dates the activities were completed.

Week

Week End Date

Task

Date Completed
1

January 27

Write tutorial introduction

January 22
2

February 3

Verify motor parameters

Not Completed
3

February 10

Simulate motor model in MATLAB

February 10
Design/Simulate motor model and controller design in MATLAB March 10
Design/Simulate motor model and controller design using Simulink April 9
4-5

February 24

Make required adjustments to model and download to DS1103

March 12
6

March 3

Design/Build/Test hardware for motor subsystem

February 12
7

March 10

Design/Build/Test hardware for optical encoder system

February 17
8-10

March 31

Make required adjustments to controller model to work with motor and hardware and download to DS1103

March 12
11-13

April 21

Improve controller or Design/Build/Test additional controllers

April 23
14

April 28

Work on presentation/final report

May 12
15

May 5

Presentation

May 5
16 May 11 Final Report due May 12